

|
|
|
|
|
1929-1934 Construction of the Ural Copper Electrolytic Factory 1934 First copper production 1940 Achievement of designed capacity 1940-1960 Re-equipment of production facilities 1962 A new Slurry Treatment Plant was put into operation 1966 The Factory was awarded with the Order of the Red Banner of Labor 1975 “Uralelectromed” Copper Refinery was organized 1976 Copper shaft furnace was started-up 1978 A new Copper Powder Production was put into operation 1984 “Uralelectromed” Copper Refinery was awarded with the Order of the October Revolution 1986 The Copper Foil Plant was put into operation 1992 “Uralelectromed” made a start as AOOT (Open Joint-Stock Company) 1996 Quality management system was certified in accordance with ISO 9002 1997 Gold and Silver Refinery was started-up 1998 Non-Ferrous Alloys Production was created upon the facilities of the Verkh-Neivinsk Plant 1999 The Copper Wire Rod Plant made a start 2001 “Polymetals Production”, a new division of the “Uralelectromed”, was created based on the “Kirovgrad Metallurgical Company” Closed Joint Stock Company “Raduga” joined АООТ “Uralelectromed” 2002 According to a new Charter of the Company its business legal structure was changed from AOOT to OAO The construction of granular selenium plant was triggered based on Chemical and Metallurgical Production to increase ST-1 selenium output up to 50 tpy 2003 Gas treatment plant of Copper Smelter was constructed JSC “Safyanovskaya med” was incorporated into JSC “Uralelectromed” 2004 JSC “Uralelectromed” received Good Delivery status for silver 2005 Briquetting Plant for agglomeration of copper, gold and recycling materials was put into operation at “Polymetals Production” Hot Dip Galvanizing Plant was started-up. Environmental management system was certified in accordance with ISO 14001:2004 and Occupational safety and health management system – for compliance to OHSAS 18001:1999 2006 JSC “Uralelectromed” was included into Good Delivery list for gold 2007 Lead production of Non-Ferrous Alloy Production was renovated to get pure lead 2008-2009 Reconstruction of gas treatment plant at Chemical and Metallurgical Plant In 2006 we began comprehensive reconstruction of copper refinery facilities including new tank house start-up which is scheduled for 2011. |
|
|
|
|