Projects and Investments |
804.7 mln. rubles will be invested into capital construction in accordance with OAO “Uralelectromed” schedule for 2005.
- Re-equipment of anode furnace №3 of Copper Smelter
Construction of division on fine raw materials briquetting was started on January, 2004 within capital reconstruction of existing Polymetals Production. Putting the object into operation will provide the opportunity to reject reverberatory furnace which is the key source of air pollution in Kirovgrad. Construction works will be completed in the middle of 2005 (picture).
- Reconstruction of gas treatment facilities of Chemical and Metallurgical Production
Gas treatment system of Chemical and Metallurgical Production is being constructed in stead of old one and it provides the treatment of spent gases for smelting furnaces up to rate of maximum permissible emission. In addition there is possibility for extra recovery of valuable elements – tellurium, selenium and precious metals – from industrial products of gas treatment. Gas treatment facilities of Copper Smelter were built at OAO “Uralelectromed” on December, 2003 to treat spent gases from smelting furnace up to 99%.
- Reconstruction of gas distribution system
- Central entrance checkpoint of OAO “Uralelectromed” (picture) (фото)
- Site on cast iron balls production of Non-Ferrous Alloys Production, Verkh-Neyvinsk settlement.
Scheduled annual output of 22 ths tons of cast iron balls will meet in full all current needs for this product of UMMC’s dressing mills. Rated capacity of new site will be calculated in terms of further expansion of company raw material base.
- Reconstruction of existing tailing dump of Polymetals Production (Kirovgrad).
- Hot dip galvanizing of fabricated metal products.
Hot dip galvanizing being one of anticorrosive covering technologies for steel works is different from other technologies by high productivity and versatility (there is opportunity to galvanize the articles of different sizes and configuration). Hot dip galvanized articles are widely used in construction and service laying.
- Ten-storey dwelling house at Ordzhonikidze street (picture).
- 9-storey dwelling house at Lenin street.
|
|
|
|
|